广庆燃气 关于我们 | 公司招聘 | 证书介绍 | 企业图库 | ENGLISH
IMPCO
首页 产品目录产品询价技术解答行业动态下载中心成功案例 联系我们
Get Adobe Flash player
产品类别
·IMPCO 零部件产品  ·混合器/汽化器类 ·减压阀类 ·切断阀/电磁阀类 ·大功率混合器 ·喷嘴 ·维修更换及辅件   ·燃气叉车发动机   ·491GP(GQ-4Y)汽油机零配件 ·491GP(GQ-4Y)叉车专用发动机 ·GM认证型/非认证型发动机 ·福特认证型/非认证型发动机 ·美国GM发动机配件 ·IMPCO K25 认证型发动机  ·重载车辆燃气零部件  ·叉车汽油机改装LPG  ·汽油叉车LPG转换装置 ·LPG/CNG 维修包及膜片 ·LPG辅件  ·Williams电子油门 ·氢气与新能源车辆产品 ·GFI 高压供氢及减压调压  ·接头及配件   · LPG/CNG叉车燃气系统套件及配件   ·改装套件 ·维修包 ·减压阀 ·电磁阀 ·更换膜片 ·接头及配件  ·转换开关 ·混合器 ·液化气钢瓶  ·钢瓶支架   ·叉车专用发动机  ·叉车(发动机)零配件   ·国产叉车发动机零配件  ·进口叉车发动机零配件   ·发电机组  ·MADAS 减压阀  
技术解答
缸垫更换指导说明
更新时间:2013.05.10 浏览次数:
 

Fuel Rail Inspection and Installation
1. Remove the fuel injector retaining clip (6), and remove the
fuel injectors (4).
2. Inspect the fuel injectors (4) and the fuel injector O-rings (3,
5), replace if necessary.
3. Install the fuel injectors (4) into the fuel rail (2).
4. Install the fuel injector retaining clips (6).
5. Install the fuel rail assembly (2) and secure to the fuel rail
bracket with the fuel rail bracket bolts (1).
Tighten
Tighten the fuel rail to fuel rail bracket bolts to 12 N•m (106 lb in)

Cylinder Head Torque Sequence
1. With the fuel rail bracket and fuel rail installed, tighten all
cylinder head bolts.
Tighten
Tighten the cylinder head bolts in sequence to 135 N•m (100 lb ft).
汽缸盖安装顺序
1. 随着燃料系统导轨和燃料系统导轨托架的安装,预紧所有的缸盖栓拧紧:
按顺序拧紧所有的缸头螺栓。力矩达到135N.m(100 lb ft)

 

 

Valve Lifter Installation
1. Coat the bottom of the valve lifters with prelube, GM P/N
1052365 or equivalent.
2. If reusing the valve lifters, install in their original location.
3. Install the valve lifters.
气门挺杆安装
1. 用机油涂抹气门挺杆外部。
2. 假如是重复使用气门挺杆,安装在原来的位置
3. 安装气门挺杆

Valve Rocker Arm and Pushrod Installation
Important: Be sure to keep parts in order. Parts must be installed
from where they were removed.
1. Install the valve pushrods. Be sure that the valve pushrods
seat in the valve lifter sockets.
气门遥臂和推杆的安装
重要的:一定要保持零件安装顺序
所有零件必须安装在零件被拆除的地方
1. 安装气门推杆,必须保证气门推杆插到气门挺杆凹槽。

2. Install the following components:
2.1. The valve rocker arms (3).
2.2. The valve rocker arm balls (2).
2.3. The valve rocker arm nuts (1).
2. 安装下列组件
2.1气门推杆(3)
2.2气门摇臂球(2),安装前气门摇臂球必须用干净机油润滑
2.3气门摇臂螺母(1)

3. Adjust the valve rocker arm nuts as follows:
3.1. Turn the crankshaft until the mark on the crankshaft
pulley lines up with “0” on the timing tab and number
1 cylinder is at top dead center.
3.2. Place fingers on the number 1 valves as the mark
approaches “0.” If the valves move as the mark
approaches “0,” the engine is on number 4 top dead
center and should be rotated one more revolution in
order to reach number 1 top dead center.
3.3. With the engine at number 1 top dead center, adjust
the following valves:
– The exhaust valves 1,3
– The intake valves 1,2,4
3.4. Adjust the correct valves as follows:
3.4.1. Back off the valve rocker arm nut until the
lash is felt in the valve pushrod.

3.调节气门摇臂螺母如下。
3.1转动曲轴,直到飞松刻度线与机体的零刻度线对齐。使发动机第一缸处于压缩行程上止点。
3.2靠近飞轮一端为第一缸,假如转动飞轮,使机体零刻度线与飞轮刻度线对齐,但是四缸处于压缩行程上止点,应该再次装懂,使一缸处于压缩行程上止点。
3.3发动机第一缸处于压缩行程上止点时,调整气门如下
----1缸和3缸排气门
----1缸和2缸进气门
3.4调整正确的气门如下
3.4.1后退气门摇臂螺母,直到感觉到推杆可以自由移动。
3.4.2预紧气门摇臂螺母直到移动被删除

3.4.3. Zero lash can be felt by moving the valve
pushrod up and down between your thumb
and forefinger until there is no more
movement.
3.4.4. When all the free play is gone, tighten the
valve rocker arm nut 1 additional turn (360
degrees).
3.5. Turn the crankshaft 1 revolution until the mark on the
crankshaft pulley lines up with “0” on the timing tab.
This is number 4 top dead center.
3.6. With the engine at number 4 top dead center, adjust
the following valves:
– The exhaust valves 2,4
– The intake valves 3
3.6.1. Back off the valve rocker arm nut until the
lash is felt in the valve pushrod.
3.6.2. Tighten the valve rocker arm nut until all the
lash is removed.
3.6.3. Zero lash can be felt by moving the valve
pushrod up and down between your thumb
and forefinger until there is no more
movement.
3.6.4. When all the free play is gone, tighten the
valve rocker arm nut 1 additional turn (360
degrees).

3.4.3用你的拇指和食指来感觉,气门推杆上下刚好都不可以移动。
3.4.4当自由移动消失时再次预紧气门摇臂螺母3600   
3.5转动到曲轴直到飞轮刻度线与机体零刻度线对齐,使发动机第四缸处于压缩行程上止点。
3.6当发动机第四缸处于压缩行程上止点,调整以下气门
----2缸和4缸排气门
----3缸和4缸进气门
3.6.1送掉气门摇臂螺母,直到感觉到推杆可以自由移动
3.6.2预紧气门摇臂螺母直到推杆不可以移动
3.6.3用你的拇指和食指来感觉气门推杆上下刚好都不可以移动
3.6.4当移动消失时,再次预紧气门摇臂螺母3600

Pushrod Cover Installation
1. Install the pushrod cover gasket.
2. Install the pushrod cover.
3. Install the pushrod cover bolts.
Tighten
Tighten the pushrod bolts to 4.5 N•m (40 lb in).

 
  联系我们 公司地址    点击这里给我发消息 点击这里给我发消息
  电话:+86-551-63627967 63636167
传真:+86-551-63664756
合肥市肥西路58号兴科大厦1008室
24小时免费热线:4000850911
Copyright © 2013 广庆(安徽)燃气技术有限公司 All Rights Reserved 您是第位访客! 技术支持:拓野网络